Adoption processes for EDM, EDI and BIM technologies in the construction industry

Visa fullständig post

Filer under denna titel

Filer Storlek Format Granska/Öppna
AIENEJ, Samuelson & Bjork, preprint, 2010b.pdf 2.674Mb PDF Granska/Öppna
Använd denna länk för att citera eller länka till detta dokument: http://hdl.handle.net/10227/779
Titel: Adoption processes for EDM, EDI and BIM technologies in the construction industry
Author: Samuelson, Olle; Björk, Bo-Christer
Abstrakt: Three strategically important uses of IT in the construction industry are the storage and management of project documents on webservers (EDM), the electronic handling of orders and invoices between companies (EDI) and the use of 3-D models including non-geometrical attributes for integrated design and construction (BIM). In a broad longitudinal survey study of IT use in the Swedish Construction Industry the extent of use of these techniques was measured in 1998, 2000 and 2007. The results showed that EDM and EDI are currently already well-established techniques whereas BIM, although it promises the biggest potential benefits to the industry, only seems to be at the beginning of adoption. In a follow-up to the quantitative studies, the factors affecting the decisions to implement EDM, EDI and BIM as well as the actual adoption processes, were studied using semi-structured interviews with practitioners. The theoretical basis for the interview studies was informed by theoretical frameworks from IT-adoption theory, where in particular the UTAUT model has provided the main basis for the analyses presented here.
The results showed that the decisions to take the above technologies into use are made on three differ- ent levels: the individual level, the organizational level in the form of a company, and the organiza- tional level in the form of a project. The different patterns in adoption can to some part be explained by where the decisions are mainly taken. EDM is driven from the organisation/project level, EDI mainly from the organisation/company level, and BIM is driven by individuals pioneering the technique.
Permanenta länken (URI): http://hdl.handle.net/10227/779
Datum: 2011-01-03
Detta dokument registreras i samling:

Visa fullständig post

Sök i Helda


Avancerad Sökning

Bläddra

Aktivitet